Project 01 — Oil & gas
Kulsary – Tengiz industrial water pipeline
A 104 km linear facility supplying industrial and potable water to the Tengiz field and other consumers of Zhylyoi district. Concept and detailed design, including State expert review.
- Client
- KazTransOil JSC
- End user
- Tengizchevroil (sponsor and consumer)
- Contract route
- Subcontract via GAZ Stroy montazh KZ LLP (client — KazTransOil JSC, sponsor and consumer — Tengizchevroil)
- Location
- Kulsary – Tengiz, Zhylyoi district, Atyrau region
- Period
- February – December 2018 (including State expert review)
Project objective
Industrial and potable water supply for the Tengiz field and other consumers of Zhylyoi district.
Main facilities
- Tie-in to the Astrakhan – Mangyshlak pipeline
- Pump station with a tank and a metering/treatment unit
- Pipeline infrastructure (metering units on branches, fiscal package)
Permits and approvals
- Land rights along the entire route
- Technical conditions for all crossings
- Approvals from the Akimat and the Emergency Situations Department
- Environmental assessment
- State expert review in Astana
- Designer's supervision
Challenges
- Category I facility (technically complex)
- More than 200 utility crossings
- Saline soils > 30 %
- High-pressure pump station with variable-frequency drives
- More than 60 km of fibre-optic line
- Very tight schedule
Project materials

Satellite map of the pipeline route from Kulsary to TCO 
3D model of the pump station with a tank farm 
Inside a steel tank during construction 
Engineer's workstation with drawings on screen
Other projects
Back to projectsOpen to long-term cooperation
A reference list of completed projects is available on request.