3D model of the Shanyrak rotational camp

Project 08 — Utilities / social

“House 6” for 4,000 beds at the Shanyrak (ESS) rotational camp

Construction and operation of “House 6” at the Shanyrak rotational camp at Tengiz. Client — USS Support Services LLP, end user — TCO.

Client
USS Support Services LLP
End user
Tengizchevroil LLP (TCO)
Location
Shanyrak, Tengiz
Period
July 2016 – August 2016
Status
Completed

Project objective

“Construction and operation of ‘House 6’ for 4,000 beds at the Shanyrak (ESS) rotational camp.”

Scope of work

  • Dormitory building: footprint at least 1,000 m², volume at least 3,000 m³, gross floor area at least 1,000 m²
  • Recreation building — 2 units: footprint at least 1,000 m², volume at least 3,000 m³, gross floor area at least 1,000 m²

Project materials

  • Top view of the camp layout
    Top view of the camp layout

Other projects

Back to projects

Open to long-term cooperation

A reference list of completed projects is available on request.